The property occupies a Stalin-era building that was in critical condition at the start of the project. During reconstruction, all floor slabs between the three levels were replaced, providing full sound, vibration, water, and dust insulation while reinforcing the structural frame. This ensured safety, longevity, and technical integrity, while preserving the authentic architectural fabric of the building.