Window Installation
location Austin (Tx, USA) / year 2025 /
duration 6 days
Photo by Kolya
Photo by Oliver
Photo by Jacob
The window installation project for a private residence in Austin became an example of precise integration of European technology within the American construction framework.

The scope included the full installation of 40 window and door units — from fixed and tilt-and-turn systems to sliding and pivot doors — all fabricated according to European standards and mounted in compliance with Texas state building codes.
Particular attention was given to airtightness and climate resistance.

Each unit was installed with certified waterproofing, vapor, and thermal insulation systems — essential for the region’s challenging climate conditions marked by heavy rains and sharp temperature changes.

The project was completed within six days: three days for the main installation phase and three for final calibration, sealing, and performance testing.

The result demonstrated exceptional coordination, speed, and technical precision, with all elements leveled by laser, fine-tuned, and tested for flawless functionality.

Project Execution Overview — “Window installation”

• Complete installation of 40 window and door systems using European technology.
• Integration of fixed, tilt-and-turn, sliding, and pivot units.
• Full compliance with Texas state construction standards.
• Comprehensive waterproofing, vapor, and thermal insulation.
• Precision alignment with laser leveling and frame sealing.
• Adjustment and calibration of all opening mechanisms.
• Final inspection and quality validation within six days.

From an early age, I’ve had the ability to adapt quickly to complex situations and find solutions where others see only dead ends. This trait has become my key tool in managing large-scale projects: from overcoming construction challenges to navigating documentation and regulatory approvals. I solve problems fast — to keep moving forward — and thoroughly — so there’s never a need to revisit them.

My work is about complete transformation. I take the keys to an abandoned, empty space and leave only when the tables are set, the plates are ready, and the manager receives the symbolic new keys tied with a ribbon. It’s a journey from chaos to structure, from a bare framework to a space that operates as a seamless mechanism. And it’s this responsibility for the final result that defines me and my work.